Key takeaways

  • Film the old surface from a fixed high point, with the whole drive in view.
  • Capture the dig and the sub-base being compacted, with a level or a fall marked.
  • Film the laying in a steady shot, and a close shot of a cut around a drain.

Ready brief

Paste this into the composer

Driveway paving from one high point: the old surface, the dig and the sub-base compacted, laying sped up, a close shot of a cut around a drain, jointing and sweeping, and the finished drive in dry daylight. Natural colour, calm music, and the company name and area as a closing title.

The short answer

A paved driveway looks simple, yet the quality is in what you cannot see afterwards: the dig, the sub-base and the falls for drainage. Film those layers before they are covered. Then follow the laying from a fixed high point, with close shots of the cuts and the jointing, and end with the finished drive in good light. Keep the machines and the people in frame; they show scale.

Step by step

  • 1. Film the old surface from a fixed high point, with the whole drive in view.
  • 2. Capture the dig and the sub-base being compacted, with a level or a fall marked.
  • 3. Film the laying in a steady shot, and a close shot of a cut around a drain.
  • 4. Show the jointing and the sweeping.
  • 5. End on the finished drive from the same high point, and the company name as a title.

Tips

  • Film the sub-base before the sand; it shows the work.
  • Add a line to camera about drainage, with captions.
  • Film the finished drive when it is dry.

Mistakes to avoid

  • Showing a different drive for the after.
  • Hiding that the job needed more days than stated.
  • Skipping the base, which customers care about.

Do it on RenderHour

Upload the clips (up to 150 and 30 minutes of footage in one edit) and paste this brief:

Driveway paving from one high point: the old surface, the dig and the sub-base compacted, laying sped up, a close shot of a cut around a drain, jointing and sweeping, and the finished drive in dry daylight. Natural colour, calm music, and the company name and area as a closing title.

If the brief leaves a real choice open, the director asks before it edits. Changes after delivery are asked for in words, and each one is a new version.

What it costs

Edits are paid in credits by the footage they read and the director you pick: a minute of footage with GPT 6 Luna costs 64 credits. The price is shown before an edit runs, and a failed edit costs nothing.

Questions

Should I film the base?

Yes. It is the part the customer will not see again.

What if the weather changed?

Say so in a title and film the finished drive in dry light.

Your next video starts here

Start editing →